The Designer's Guide Community Forum
https://designers-guide.org/forum/YaBB.pl
Design >> Analog Design >> Monte Carlo simulation takes longer
https://designers-guide.org/forum/YaBB.pl?num=1146796037

Message started by huber on May 4th, 2006, 7:27pm

Title: Monte Carlo simulation takes longer
Post by huber on May 4th, 2006, 7:27pm

I'm seeing about a 10x increase in simulation time for a Monte Carlo run compared to a normal simulation.  Is there any good reason for this or is this a symptom of a faulty design kit?  I'm doing a transient simulation of a subranging ADC with ~30k transistors and ~15k nodes in spectre.

Another question for anyone farmiliar with Monte Carlo: is there any reason to do the nominal run?  I usually turn this off.

Thanks for any help,
-Dan

Title: Re: Monte Carlo simulation takes longer
Post by Andrew Beckett on May 15th, 2006, 1:44am

One possible reason can be the increased memory usage - particularly if you're using mismatch (you end up with a lot more models, as each device has its own model).
Because of the extra memory, perhaps it is swapping?

Are you using MMSIM60? If so, that should help with memory consumption (the new front-end is much more memory efficient in these situations).

There's not normally much benefit in doing the nominal run in my opinion (except as a sanity check?).

Regards,

Andrew.

The Designer's Guide Community Forum » Powered by YaBB 2.2.2!
YaBB © 2000-2008. All Rights Reserved.