Measure losses in the following two cases.
(1) "GSG"-"Thru"-"GSG"
(2) "180degHyb"="GSSG"="Thru"="GSSG"="180degHyb"
Measure DUT like following.
"GSG"-"DUT"="GSSG"="180degHyb"
Here use half of loss (1) as "Pre loss Compensation".
And use half of loss (2) as "Post loss Compensation".
You can use frequency table for both "Pre loss Compensation" and "Post loss Compensation" as well as fixed values.
See the following.
http://www.designers-guide.org/Forum/YaBB.pl?num=1233236788/1#1